Gotsu Industrial Park

§ Outline of The Indutrial Park

Gotsu Industrial Park

area
Area of land
available in lots
34.6ha
(Including undeveloped land )
Cost of lots 12,000yen/ square meter
Cost after the municipal
subsidization:9,600yen/ square meter
Total area 73.8ha
Usable area 48.5ha(developed land 21.3ha)
Area of land
available in lots
13.5ha
‰¯Ò‰ÐãËxLand Acquisition
Subsidization of industrial water costs
Power supply 6.6kv cables already available
0.3km to 66kv cables
Water Industrial water
— 15,000 cubic meters/day
Plus 35,000 cubic meters/day from other sources
Waste water Disposed of in the Sea of Japan via the Yabukawa river after in-house treatment