[MENU]
| OUTLINE OF SHIMANE
||| MAJOR INDUSTRIAL PARKS ||| INCENTIVE PROGRAMS | REFERENCES |
Hane District Industrial Park

§ Outline of The Indutrial Park

Hane District Industrial Park

area
Area of land
available in lots
6.1ha
Cost of lots

11,000yen/ square meter

Total area 17.6ha
Usable area 10.2ha
Area of land
available in lots
3.5ha
Power supply 6.6kv cables already available 0.2km to 66kv cables
Water Overland water supply
—400 cubic meters/day
Waste water Disposed of in the Hane river after in-plant treatment

Shimane Prefecture Industrial and Commercial Labor Development Industrial Land Development Division
kigyo-richi@pref.shimane.jp

[MENU] [BACK]